Electricity Bonus
What is the Electricity Bonus
CAF – LAVORO E FISCO has signed agreements with ANCI and with local Municipalities for managing applications related to the Electricity Bonus for physical hardship.
N.B. Please note that at the offices of CAF – LAVORO E FISCO it is also possible to process the ISEE (Equivalent Economic Situation Indicator) model in order to automatically receive the Electricity and Gas Bonuses (economic hardship) subsidy for all households with proven financial difficulties.
Severe health conditions – physical hardship
Who is entitled to it
The bonus can be obtained by all domestic customers suffering from a severe illness, or domestic customers with an electricity supply in whose home lives an individual suffering from a severe illness who is forced to use electromedical equipment necessary for life support.
The list of life-saving electromedical equipment that entitles one to the bonus was established by the Decree of the Ministry of Health of 13 January 2011.
The bonus for physical hardship can be combined with the bonus for economic hardship (both electricity and gas) provided the respective eligibility criteria are met.
How to apply
Where to submit the application?
The application must be submitted to the Municipality of residence of the electricity supply account holder (even if different from the patient) using the appropriate forms, or to another body designated by the Municipality (CAF, mountain communities).
What documents are needed to submit the application?
To access the bonus, the customer must hold:
- an ASL certificatePDF · IT (Local Health Authority certificate) certifying:
- the situation of severe health condition;
- the necessity of using electromedical equipment for life support;
- the type of equipment used and the daily hours of use;
- the address where the equipment is installed;
- the identity document and codice fiscale (tax code) of the applicant and of the patient, if different from the applicant;
- the completed Form BPDF · IT;
it is also necessary to have certain information available, which can be found on the bill or in the supply contract:
- the POD code (Point of Delivery identifier for the energy supply). The POD code is an alphanumeric code beginning with IT that unambiguously identifies the physical point where the energy is delivered by the supplier and withdrawn by the end customer. The code does not change even when switching suppliers;
- the contracted or available power capacity of the supply.
To request the bonus, other forms of disability certification, such as certificates of civil disability, cannot be used.
Is it necessary to submit the ISEE to obtain the bonus for severe health conditions?
No, submitting an ISEE is not required. The bonus for these situations is granted regardless of the applicant's income bracket.
Is it possible to delegate another person to submit the application?
Yes, by filling out the dedicated proxy form Annex DPDF · IT.
How is the bonus received?
The amount of the bonus is discounted directly on the electricity bill, not as a lump sum, but broken down across the various bills corresponding to the consumption over the 12 months following the submission of the application.
Each bill shows a portion of the bonus proportional to the period to which the bill refers.
How to verify that the bonus has been granted and is being paid?
When the bonus is granted, a specific notification is included on the bill. When the bonus is being disbursed, both the approval for compensation and the detailed breakdown of the amount relating to the application of the bonus are highlighted on the bill in the section "totale servizi di rete – quota fissa" (total network services – fixed quota).
The progress of one's bonus application can be checked:
- at the entity where the application was submitted (the Municipality of residence, the CAF, the Mountain Community, etc.) using the receipt issued upon submission of the application;
- by calling the toll-free number 166.654 providing the codice fiscale or the application identification number;
- by visiting the website bonusenergia.anci.it, accessing the reserved section "Check your application online" and entering one's codice fiscale and login credentials.
The credentials (User ID and password) are issued by the Municipality or the CAF where the application for the bonus was submitted.
How long does it take before receiving the bonus on the bill?
Before being converted into a discount on the bill, the bonus application must go through a series of verification steps regarding eligibility requirements by the Municipality and Sgate, as well as communications between these bodies and the relevant operators.
Only at the end of these steps, and provided the application meets all requirements, will the customer receive the bonus on their bill.
How long is the bonus granted for?
The bonus for physical hardship is disbursed without interruption for as long as the equipment is used. The discontinuation of use of such equipment must be promptly reported to one's electricity vendor.
Can the disbursement of the bonus be suspended?
Situations may arise where the disbursement of the bonus is suspended following a check by the Municipality or the competent distribution company that reveals the lack or alteration of one of the conditions required to be entitled to the benefit (for example, if the electricity supply is terminated due to the customer moving, or if the equipment is no longer used).
In these cases, the customer receives a communication from SGAte informing them of the suspension (or revocation) of the compensation and the reasons for it.
Variations
Is it necessary to submit a renewal application?
The bonus for physical hardship does not need to be renewed; it is disbursed until the electromedical equipment is no longer used.
If the bonus application was submitted in 2012, is it possible to request an adjustment?
Yes, an adjustment can be requested. Individuals who had already applied for and obtained the bonus before 2013 can check whether, according to the new bonus levels, they are entitled to a higher subsidy amount. If, using the simulation application, a bracket higher than the minimum is assigned, it is possible to submit a variation request using the new forms (Form BPDF · IT and annexes) and ticking the appropriate box "variazione apparecchiature" (equipment variation). The variation takes effect from the date the application is submitted.
Is it possible to request an adjustment if new equipment is installed?
Yes, an adjustment can be requested both if new equipment is installed and if existing equipment needs to be used for a greater number of hours per day.
It is necessary to submit Form BPDF · IT ticking the box "variazione apparecchiature". It is always advisable, before submitting a variation request, to check with the simulator, because it may happen that despite the increase in equipment or operating hours, the bonus amount does not change. In such a situation, the SGAte system does not accept the variation request, and the ongoing benefit remains unchanged.
In the event that a different bonus level is assigned, the variation takes effect from the date the application is submitted.
What must the customer do if they no longer use the equipment?
The customer is required to promptly notify their electricity vendor, as the cessation of equipment use entails the termination of the bonus.
If the customer does not inform their vendor of the discontinuation of equipment use and continues to receive the bonus without entitlement, repayment of the unduly received amounts may be requested.
What happens if the electricity supplier changes?
In the event of a change of vendor or of the economic terms of the contract, the bonus continues to be disbursed without interruption until the equipment is no longer used.
What happens if the account holder of the contract changes?
If the contract, originally registered in the name of a person other than the patient, is transferred into the patient's name (contractual transfer, or voltura), the bonus continues to be disbursed without interruption.
Conversely, if the contract is transferred to another individual who does not reside where the customer in severe health conditions lives, the bonus ceases.
| Year 2019 | MINIMUM BRACKET | MEDIUM BRACKET | MAXIMUM BRACKET |
|---|---|---|---|
| extra consumption compared to standard user (2700/kWh/year) | up to 600 kWh/year | between 600 and 1200 kWh/year | over 1200 kWh/year |
| up to 3 kW | € 204 | € 336 | € 486 |
| over 3 kW (from 4.5 kW upwards) | € 478 | € 605 | € 732 |